satoriresources

View all authors posts further down below.

Satori Reports 29.06 g/t Gold over 5.85 Metres in Latest South Zone Drill Holes

Toronto, Ontario – August 11, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the latest drill results from the spring exploration drilling at the 100%-owned Tartan Lake deposit near Flin Flon, Manitoba. Satori’s winter drill program focused on shallow holes targeting extensions of the South Zone mineralization down plunge to the west and initial drilling of the McFadden target, a broad area of intense quartz carbonate veining located approximately 1,600 metres south of the South Zone.

Read more

Satori Awaits Assays from 2022 Phase I Drilling Completed at Tartan Lake Gold Mine Project

Toronto, Ontario – May 25, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce the completion of its 2022 Phase I drill program at Tartan Lake. A total of 10 holes (2,900 metres) was completed. Seven holes targeted the McFadden showing, an area of intense quartz-carbonate-tourmaline veining hosted in intensely sheared and deformed volcanics, approximately 1.5 kilometres south of the Main Zone.

Read more

Satori Moves Drill Locations and Engages Investor Relations

Toronto, Ontario – April 20, 2022 – Satori Resources Inc. (TSXV:BUD) (“Satori” or the “Company”) is pleased to announce that drilling at the South Zone has now commenced at the Tartan Lake Gold Mine Project, after having completed diamond drilling at a remote/satellite target area (McFadden) located 1 kilometre south-east of the known Main Zone/South Zone deposit.

Read more

Satori Reports Highlight Summary of the 2021 Drilling Campaign, and Announces Private Placement Financing of up to $3,000,000

Toronto, Ontario – December 9, 2021 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to announce the completion of its spring / summer 2021 Phase One drilling campaign, where eleven (11) of thirteen (13) drill holes intersected anomalous gold mineralization from the 100% held Tartan Lake Gold Mine Project in Flin Flon, Manitoba. One hole (TLMZ21-03) failed due to mechanical issues, and one hole (TLSZ21-10) tested the eastern edge of the South Zone, returning insignificant gold grades. Twelve drill holes and one wedge hole totalled 7295 metres, having an estimated all-in cost of approximately C$ 275.00 per metre.

Read more

Satori Identifies New Zone at Tartan Lake with the Second Highest Grade Drill Hole in Tartan Lake History Intersecting 5.80 metres Averaging 47.56 g/t Gold

Toronto, Ontario – December 6, 2021 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to announce additional results from the completed Phase One drill program at the 100% owned Tartan Lake property, Flin Flon, Manitoba.

Read more

Satori Reports Second High Grade Intercept at South Zone, Returning 8.79 g/t Au over 4.8 Metres

Toronto, Ontario – October 14, 2021 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to report the results from the second hole (TLSZ21-06) drilled at the South Zone, intersecting 8.79 g/t Au over 4.8 metres, as part of Satori’s Phase II drilling campaign at the 100% owned Tartan Lake Project, Flin Flon, Manitoba.

Read more

Satori Drills Longest and Highest Grade Interval at South Zone Averaging 9.59 g/t Au over 11.75 Metres

Toronto, Ontario – October 7, 2021 – Satori Resources Inc. (TSXV: BUD) (“Satori” or the “Company”) is pleased to report results from the first hole (TLSZ21-05) drilled in the Company’s Phase II drilling campaign, targeting a separate location, the South Zone, at Satori’s 100% owned Tartan Lake Project, Flin Flon, Manitoba.

Read more